← Back to catalogMicroBT · 2023

Whatsminer M60 172 TH

$1,769per unit
Whatsminer M60-172 — MicroBT
About this model

About this model

Whatsminer M60 172 TH — MicroBT SHA-256 ASIC miner (2023 release): 172 TH/s at 3.4 kW (19.9 J/TH), air cooling. Hosted at the NODA site in Perm Krai at 5.3 ₽/kWh, one unit costs about 13,062 ₽ per month in electricity; estimated profit is -17 ₽ per month with a payback of roughly — months at a BTC price of $80,462 and current network difficulty.

Specifications

Specifications

Hashrate
172 TH/s
Power draw
3.4 кВт
Energy efficiency
19.9 J/TH
Algorithm
SHA256
Cooling
air
Noise
75 dB
Release year
2023
Warranty
12 months
From the manufacturer

Спецификация производителя

Краткие характеристики

  • Производитель: MicroBT (Whatsminer)

  • Модель: Whatsminer M60

  • Алгоритм / монеты: SHA-256 (BTC / BCH / BSV)

  • Номинальный хэшрейт: 172 TH/s (150–172 TH/s ±5%)

  • Энергоэффективность: 19.9 J/TH

  • Потребление от сети: 3423 Вт (3.42 кВт)

  • Охлаждение: воздушное

  • Год выпуска: 2023

Электропитание

  • Фазность: 1

  • Входное напряжение AC: 200–240 В

  • Частота входного тока: 50–60 Гц

  • Входной максимальный ток: ≤ 20 А

Подключение и охлаждение

  • Сетевое подключение: RJ45 Ethernet 10/100M

  • Тип охлаждения: воздушное (вентиляторы спереди+сзади)

  • Шум: ~75 дБ

Условия поставки и гарантия

  • Условие отгрузки: FCA Hong Kong

  • Спот (есть на складе): 100 % предоплата

  • Фьючерс (под заказ): 40 % предоплата + 45 дней производства

  • Гарантия: 365 дней с даты отгрузки

  • Источник данных: Whatsminer (MicroBT) Stock & Quotation 0519, типовые параметры серии

ROI at NODA

ROI at NODA

At current FX and network difficulty, tariff 5.3 ₽/kWh

Profit per month-17 ₽
Payback period—
Questions about this model

Questions about this model

How much electricity does Whatsminer M60 172 TH consume?
3.4 kW per hour — about 2,465 kWh per month per unit. At the NODA tariff of 5.3 ₽/kWh that is roughly 13,062 ₽ per month.
What is the payback of Whatsminer M60 172 TH when hosted at NODA?
At a price of $1,769 and a BTC price of $80,462, estimated profit is -17 ₽ per month and payback is about — months. The result depends on the BTC price and network difficulty — see the NODA calculator for current figures and scenarios.
Can Whatsminer M60 172 TH be hosted at the NODA mining hotel?
Yes. The NODA site in Perm Krai runs on its own gas-piston generation, with security and an on-duty engineering shift 24/7. Minimum placement is 5 units; payouts go directly to your pool.