N° 001Turnkey infrastructure

We design and build a site for your project

NODA's own site — 44 MW gas-fired
N° 001NODA site · Perm Krai
N° 002

Energy-and-IT campuses for ASIC miners and GPU servers, powered by gas. From land and gas pipeline to containers and commissioning — one accountable party.

Site capacity44MWOur own gas-fired site in Perm Krai.
Turnkey timeline~90daysFrom signing to first MW.
Target uptime99.9%Contractual SLA, fixed terms.
Section 02 — Who it is for

Four scenarios for a turnkey site.

Section 03 — Site stack

From land to monitoring — one contour.

  1. 01

    Land

    Plot, zoning, cadastre.

  2. 02

    Gas

    Pipeline, GRPSh, direct gas contract.

  3. 03

    Gensets

    Gas-piston units, install, commissioning, service.

  4. 04

    Substation

    Power section, KTP, cable trays.

  5. 05

    Containers

    Modular 1 MW data-center blocks for IT load.

  6. 06

    IT load

    ASIC miners or GPU servers, firmware, pools.

  7. 07

    Monitoring

    24/7 dashboard, telemetry, ongoing ops.

Section 04 — Capacity tiers

Ready-made capacity packages.

Indicative ranges at 75 ₽/USD. Final estimate is built after a site audit and equipment selection.

Section 05 — Gas vs grid

Why own gas beats grid power.

Section 06 — Stages

Stages

  1. Step 01~2 weeks

    Pre-project

    Site, power, and gas analysis. Tailored feasibility study.

  2. Step 02~4 weeks

    Design

    Engineering, approvals, budget.

  3. Step 03~8 weeks

    Build

    Site works, engineering, gensets, containers. Transparent stage reporting.

  4. Step 04~2 weeks

    Launch and operations

    Commissioning, handover. Optional ongoing operations by NODA.

Section 07 — Technology

Gas-piston gensets and modular DC blocks.

01

Gas-piston unit

Gensets on site. No exposure to grid tariffs and outages.

Model
Weichai WP13
Output
250 kW
Fuel
Natural gas
02

1 MW container

Modular DC block for ASIC miners or GPU servers. Hot/cold aisle.

Miners
263 units
PUE
≈ 1.10
Range
−45 / +38 °C
03

Hashrate and SLA

Mining fleet performance at 10 MW with the M60S++ reference model.

Hashrate at 10 MW
≈ 594 PH/s
Target uptime
99.9 %
Efficiency
15.25 J/TH
Section 08 — Live site

Site Krasny Voskhod.

NODA's own site — 44 MW gas-fired
Ust-Kachka rural settlement, Perm Krai
Case · Krasny Voskhod

NODA's own site — 44 MW gas-fired

A gas-fired site with a direct gas contract and full in-house infrastructure: gensets, substation, modular containers. The land is being re-zoned to industrial. We host customer hardware here and run our own technology stack.

Gas capacity44 MW
RegionPerm Krai
FuelNatural gas
Site area3.2 ha
Section 11 — Proofs

Team and projects.

Engineering experienceup to 100MW
Accountable contour1contract
Service stack5stages
ComplianceFZ-221+ FTS
Regulatory

FTS miner registry — handled by us

Mining in Russia is regulated by FZ-221. We handle the FTS miner-registry filings, reporting, and compliance — you don't need to navigate the law on your own.

Learn more
Section 12 — FAQ

What people usually ask before building.

Get in touch

Tell us about your project — we reply within 30 minutes

A manager will be back to you within 30 minutes during business hours and prepare a tailored estimate.

Phone · Moscow
+7 (499) 322-24-28
Phone · Perm
+7 (342) 292-24-28
Telegram
@nodagrid

We reply within 30 minutes during business hours.